The Project is a new finished goods warehouse of around 700m2 including an extension of the factory goods transfer area and loading bay. In the new finished goods warehouse, the water base and solvent base paints (1L to 20L containers) are to be stored in rack system. The rack height is around 6 meters (max 6 Heights) and the approximate rack arrangements are shown in the attached drawing. All sides of new finished goods warehouse will be constructed as firewalls.