SHAH complex power demand is approximately 500 MW. The entire plant power requirement shall be met by connection of the utility grid to the plant 220 kV Gas Insulated Switchgear (GIS). The local Power Company (ADWEA) shall supply power to the plant through two circuits of 220 kV transmission lines. The incoming line voltage will be stepped down to 33 kV for distribution of power to area substations.